Affton Slab-on-Grade Zoning Retrofit Case Study | Purisync

Affton Slab-on-Grade Zoning Retrofit: 1976 Ranch 2-Zone Attic Ductwork

Case study summary: 1976 slab-on-grade ranch home in Affton with chronic temperature variation between west-side living areas (kitchen, family room, master bedroom) and east-side rooms (bedrooms 2 and 3, hallway); existing 2018-vintage furnace and AC in good condition with 7-10 years of remaining service life; 2-zone retrofit installed using existing attic ductwork without equipment replacement; total project cost $4,200 (no equipment replacement scope); completed in 1.5 days during March 2026. Outcome: chronic temperature variation resolved (previously 6-10°F differential between zones now within 2-3°F); separate setpoint control by occupied area; modest energy savings from zone scheduling reducing output to unoccupied zones; customer satisfaction high with comfort resolution at moderate cost.

The Home

  • Built: 1976
  • Style: Slab-on-grade ranch with split living/sleeping wings
  • Location: Affton, MO 63123 (specific neighborhood off Heege Road)
  • Size: 1,720 sf with attached two-car garage
  • Construction: Slab-on-grade concrete foundation; wood frame with brick veneer on east and south elevations, vinyl siding on west and north elevations (combination original 1976 brick plus 1990s siding addition); original windows replaced with vinyl in 2014; attic insulation upgraded to R-38 during 2014 envelope work
  • Existing heating: Carrier Performance 92 (80,000 BTU/hr 92% AFUE two-stage furnace from 2018, 7 years old at time of zoning retrofit)
  • Existing cooling: Carrier Performance 16 2.5-ton AC from 2018, paired with furnace
  • Ductwork: All ductwork in attic above conditioned space; main supply trunk runs east-west across attic with branch supplies dropping through ceilings to register locations; return air via single large central return in hallway
  • Home layout: West wing (kitchen, family room, master bedroom, master bathroom) and East wing (bedrooms 2 and 3, hall bathroom) separated by central living area; chronic temperature variation between wings driven by different solar exposures and occupancy patterns

The Situation

Customer contacted us in February 2026 about chronic temperature variation that had been present since they purchased home in 2020 but became more noticeable after 2023 when children moved into bedrooms 2 and 3 (east wing) and complained about temperature differences from parents’ master bedroom (west wing). Specific symptoms:

  • Winter mornings: bedroom 2 (east wing) typically 64°F when thermostat in central living area was 70°F; master bedroom (west wing) typically 71-72°F at same time
  • Summer afternoons: bedroom 3 (east wing, west-facing window exposure) typically 76-78°F when thermostat at 72°F; west wing rooms typically at thermostat setpoint
  • Cause analysis: solar exposure differences (east wing morning sun gain, west wing afternoon sun gain); occupancy timing patterns differ between wings (kids’ rooms unoccupied during daytime when parents work-from-home in family room); ductwork distribution from central trunk delivers more air to west wing branches due to shorter duct runs and lower static pressure
  • Customer priorities: resolve comfort variation; preserve existing equipment investment (7-year-old equipment with 7-10 years remaining service life); avoid major construction scope; minimize cost while addressing the actual problem

Initial assessment confirmed zoning retrofit as appropriate solution rather than equipment replacement:

  • Equipment is good and not the source of comfort issues (proper operation, appropriate sizing, no malfunction)
  • Ductwork condition is good (no leakage, no damage, no obstructions)
  • Distribution problem is location of supply registers vs. load distribution — addressable via zoning
  • Existing 2-stage equipment supports zoning operation well (two-stage compressor and two-stage gas valve provide reduced output for single-zone operation)

The Equipment Selection

EWC Ultra-Zone UZC-2 (Selected)

  • Type: 2-zone control panel
  • Compatibility: Works with Carrier Performance 92 two-stage equipment via standard low-voltage thermostat connections
  • Capability: Manages 2 dampers, 2 thermostats, equipment staging based on zone demand
  • Why selected: Established residential 2-zone controller with strong service support and parts availability; works with existing Carrier equipment without requiring communicating system upgrade

Motorized Dampers (2 units)

  • Type: EWC 10" round motorized dampers
  • Configuration: One damper per zone in supply trunk after the equipment plenum (West zone damper and East zone damper)
  • Operation: Damper open when zone calling for heating or cooling; damper modulated closed when zone satisfied

Smart Thermostats (2 units)

  • Type: Honeywell T10 Pro smart thermostats with wireless integration
  • Locations: One in central living area (West Zone thermostat, retaining existing thermostat location) and one in hallway near bedroom 2 (East Zone thermostat, new location)
  • Programming: Each zone scheduled independently — west zone (living area) prioritizes daytime/evening setpoints when active occupancy; east zone (bedrooms) prioritizes nighttime setpoints when bedrooms occupied

The Project Scope

Pre-Installation

  • St. Louis County Public Works permit: Pulled within 4 business days; mechanical-only permit (no electrical scope beyond low-voltage thermostat wiring)
  • Equipment ordering: 7 business days for EWC zoning components and Honeywell thermostats

Installation Day 1 (March 24, 2026)

  • Initial attic access and ductwork assessment: confirmed configuration matched expectations from quote development; identified specific damper installation locations in supply trunk
  • Supply trunk modification for damper installation: cut into supply trunk at two locations (one for west zone branch trunk, one for east zone branch trunk); installed dampers with appropriate transition fittings; sealed all cuts with mastic per duct sealing best practices
  • Damper actuator wiring: low-voltage wiring run from damper actuators to zone control panel location (mechanical room near equipment); secured wiring per code in attic environment
  • Zone control panel installation: EWC Ultra-Zone UZC-2 mounted near furnace in mechanical room; power connections (24V from equipment transformer); thermostat connections; equipment connections
  • End of Day 1: dampers installed in ductwork, control panel installed, wiring in progress

Installation Day 2 morning (March 25, 2026)

  • Thermostat installation and wiring
  • West Zone thermostat: Honeywell T10 Pro replacing existing thermostat at same central living area location (existing wiring connections used)
  • East Zone thermostat: Honeywell T10 Pro installed at new location in hallway near bedroom 2 (low-voltage wiring run from zone control panel through wall and ceiling cavities to new location)
  • System programming and configuration: zone control panel configured for west and east zones; thermostat settings configured for customer’s typical schedule (daytime west zone priority, nighttime east zone priority)
  • Initial commissioning: heating mode test (each zone calls independently; equipment responds appropriately; dampers operate correctly); cooling mode test similar; both-zones-call test (equipment runs at higher stage; both dampers open)
  • Damper operation verification: smoke pencil test at each register to verify air flow follows zone demand correctly; west registers receive air only when west zone calls, east registers similar
  • Equipment staging verification: single zone call results in low-stage equipment operation; both-zones call results in high-stage equipment operation; transitions between stages smooth
  • Customer walk-through: explained operation, smart thermostat programming, zone scheduling, expected operation across seasons
  • Final cleanup and customer sign-off

Inspection (March 31, 2026)

  • St. Louis County DPW inspector visit 6 business days after installation
  • Mechanical inspection: damper installation, ductwork modifications, zone control panel installation verified
  • Installation passed inspection without modifications

The Pricing

  • EWC Ultra-Zone UZC-2 control panel: $440
  • 2 EWC 10" motorized dampers: $480
  • 2 Honeywell T10 Pro smart thermostats: $480
  • Installation labor (1.5 days, 2 technicians): $1,800
  • Supply trunk modifications and damper fittings: $280
  • Low-voltage wiring (thermostat to control panel, damper actuators to control panel): $240
  • St. Louis County DPW permit: $180
  • Smoke pencil testing and commissioning verification: $100
  • Drywall and paint patching (where new thermostat wire entered wall cavity): $120
  • Miscellaneous fittings, mastic, hardware, and consumables: $80
  • Total project cost: $4,200

This pricing fell within our standard range for 2-zone retrofits on existing equipment ($3,400–$5,400 depending on ductwork access, thermostat wiring complexity, and equipment compatibility). Equipment-only replacement scope would have run $9,000-$13,000 for furnace + AC replacement, plus zoning addition; preserving existing equipment and adding only zoning was substantially better economic decision for this customer’s situation.

The Outcome

Comfort Resolution

  • Temperature variation eliminated: previously 6-10°F differential between west and east wings now reduced to within 2-3°F during typical operation; both zones reach setpoint reliably
  • Independent setpoint control: customer using zones to maintain east wing (children’s bedrooms) at slightly lower nighttime setpoint than parent’s wing while parents work from home during day at slightly higher setpoint in west wing; specific zone-by-zone control matches actual usage patterns
  • Solar gain compensation: east wing morning sun gain (which previously caused mid-morning overheating in bedrooms) now compensated by zone scheduling that reduces cooling output to east zone before sun exposure begins

Equipment Operation

  • Single-zone operation: equipment runs at low stage when only one zone calls; this is the typical operational mode during shoulder seasons and overnight periods
  • Both-zones operation: equipment runs at high stage during peak demand periods (cold mornings, hot afternoons) when both zones call simultaneously
  • Two-stage equipment benefit: existing two-stage equipment proved excellent match for zoning operation; single-stage equipment would have required additional bypass dampers or other modifications to prevent excess static pressure during single-zone operation

Energy Performance

  • First few months energy data limited: insufficient operating data to calculate definitive savings; preliminary estimate based on first 60 days suggests 8-12% reduction in heating/cooling energy from zone scheduling (operating equipment only for zones actively occupied)
  • Annual savings projection: approximately $180-$280 reduction in annual heating/cooling costs assuming first-60-days pattern continues; modest savings but secondary benefit to primary comfort resolution

Customer Feedback

Customer reported high satisfaction with several aspects: chronic 6-year comfort issue resolved at fraction of equipment replacement cost; zone scheduling flexibility provides ongoing optimization opportunity (customer continues adjusting schedules as preferences are refined); smart thermostat app provides visibility into actual zone temperatures and runtime; respect for existing equipment investment (avoided premature replacement of 7-year-old equipment with 7-10 years remaining service life).

Ongoing Service

Customer enrolled in maintenance plan covering equipment plus new zoning system; annual maintenance scheduled fall (before heating season).

Frequently Asked Questions

Why did you recommend zoning instead of equipment replacement?
Two specific reasons: equipment age and condition, plus the specific nature of the comfort problem. Equipment factors: the customer’s 2018 equipment was 7 years old at quote time, with typical 15-20 year service life on Carrier Performance equipment that’s been well-maintained; equipment showed no signs of failure or efficiency degradation; replacement would have been premature by 8-13 years. Comfort problem analysis: chronic 6-10°F variation between wings of home wasn’t equipment-related (equipment was operating properly and meeting thermostat setpoint at thermostat location); problem was that single thermostat couldn’t represent temperature conditions throughout the spread-out ranch layout; supply register placement and ductwork distribution couldn’t be modified to balance load distribution without major reconstruction. Zoning addresses exactly this scenario: separate thermostats sense conditions in different areas of home; separate dampers control airflow to each zone based on actual demand; equipment runs at appropriate output for actual demand. Alternative approaches considered: ductwork rebalancing (limited effectiveness because the fundamental issue is solar exposure and occupancy timing differences between wings, not ductwork sizing); supply register additions (could improve specific room comfort but doesn’t address the broader pattern); equipment replacement with variable-capacity equipment (would have provided minor improvement in distribution but at $9,000-$13,000 cost vs. $4,200 zoning solution). For customers with comfort issues driven by distribution rather than equipment problems, zoning is often the correct intervention rather than equipment replacement.
How does 2-zone control work with single-stage versus 2-stage equipment?
Substantial difference in operational behavior and need for additional accessories. Two-stage equipment (this case study with Carrier Performance 92): equipment has explicit low-stage and high-stage operation; single zone call triggers low-stage operation (50-65% of full capacity, depending on equipment design); both-zones call triggers high-stage operation (100% capacity); equipment operation matches actual load well; no additional bypass dampers or other accessories required; zoning operation efficient and effective. Single-stage equipment: equipment runs at full capacity whenever operating; single zone call with full equipment capacity creates excess static pressure in supply trunk (because part of trunk is closed by damper but full equipment capacity is still being delivered); excess static pressure can damage ductwork, force open damper seals, create noise, or compromise equipment operation; solution requires bypass damper between supply trunk and return air pathway that opens during single-zone operation to relieve static pressure; bypass damper installation adds $300-$500 to zoning cost plus reduces zoning efficiency benefit (some conditioned air bypasses the home directly back to equipment). Variable-capacity (communicating) equipment: equipment modulates capacity continuously from 40-100%; matches actual load very well; no bypass needed; communicating system handles zone integration automatically; most expensive equipment tier but provides excellent zoning performance. For this customer’s existing two-stage equipment, the zoning installation was straightforward and didn’t require bypass dampers; for customers with single-stage equipment considering zoning, the bypass damper addition is necessary scope to discuss during quote development.
What if my comfort problems are localized to specific rooms rather than wings?
Different solutions for different problem patterns. Whole-wing temperature variation (this case study): 2-zone or 3-zone retrofit appropriate, with zone boundaries matching the distinct wing layout. Single-room problems within otherwise comfortable home: typically not appropriate for zoning (single-room zones rarely make economic sense due to small load and high installation cost); usually better addressed by supply register modifications (adding registers, relocating registers, or modifying register designs for better distribution to specific rooms); for bedrooms with persistent comfort issues, ductless mini-split single zone installation is alternative ($2,800-$4,800 for single-room ductless vs. $1,800-$2,800 for register modifications). Multi-room patterns matching distinct usage scenarios: 3+ zone retrofit possible (e.g., main living area, bedrooms, bonus room) but cost scales with zone count ($2,400-$3,800 per additional zone beyond initial 2 zones); economics need careful evaluation. Solar exposure differences: zone boundaries should align with solar exposure patterns (east-facing rooms vs west-facing rooms); zoning addresses the timing difference of solar gain. Occupancy timing differences: zone boundaries should match usage patterns (bedrooms vs. living areas); zoning addresses energy savings from operating equipment only for occupied spaces. Insulation/window differences: rooms with substantially different envelope characteristics may benefit from zoning if differences are large; modest differences typically managed through equipment operation rather than zoning. We assess specific comfort patterns during quote consultation to determine whether zoning is the right solution or whether other interventions would better address the specific issues.
How much energy does zoning actually save?
Modest savings typically — comfort improvement is the primary benefit. Industry estimates for zoning energy savings: 10-20% reduction in heating and cooling energy claimed by some manufacturers; this depends heavily on actual operational pattern (how much of home is unoccupied at any given time, how much temperature differentiation is used between zones). Real-world savings on this case study: first 60 days showed 8-12% energy reduction estimate; full annual data not yet available; projected annual savings $180-$280 at typical St. Louis energy rates. Factors that increase zoning savings: large home with substantial unoccupied areas (e.g., 4-5 bedroom home where children’s bedrooms unoccupied during day); significant temperature differentiation between zones (e.g., 5-10°F lower setpoint in bedroom zone at night); active use of zone scheduling rather than maintaining all zones at same setpoint. Factors that reduce zoning savings: small home with minimal unoccupied space; minimal temperature differentiation between zones (occupants prefer uniform comfort); inactive zone scheduling. Comfort vs. energy savings priority: for most customers with comfort issues driving zoning consideration (like this customer), the comfort resolution is the primary value; energy savings are pleasant secondary benefit. Customers considering zoning purely for energy savings often find the economics don’t work out — installation cost of $3,400-$5,400 takes 15-25 years to recover on $180-$280 annual savings, longer than typical equipment service life. Customers with active comfort issues find zoning provides immediate quality-of-life improvement plus modest ongoing savings.
Can I add more zones to my existing 2-zone system later?
Yes, but with cost and complexity scaling considerations. 2-to-3-zone upgrade scope: add additional damper to supply trunk for new zone; add additional thermostat at new zone location with low-voltage wiring; upgrade zone control panel if existing panel is 2-zone limited (some panels support up to 4 zones with addition of zone expansion modules, others are 2-zone limited requiring panel replacement); test and commission new zone configuration. Cost estimate for 2-to-3-zone upgrade: $2,000-$3,200 depending on specific scope (damper installation accessibility in attic, thermostat wiring routing complexity, panel upgrade requirements). Practical limits: 2-zone configurations adequate for most ranch homes with distinct wings; 3-zone configurations useful for homes with three distinct areas (main living, master bedroom suite, secondary bedrooms); 4+ zone configurations typically only appropriate for very large homes with substantial area differentiation. EWC Ultra-Zone series: UZC-2 (2-zone, as installed) supports zone expansion with additional modules; UZC-4 (4-zone) and larger systems available with corresponding cost increases. Customer-side considerations for future zone additions: install initial 2-zone configuration sized for likely future expansion (use panel that supports expansion, plan damper locations considering possible future additional zones); add new zones when comfort needs justify the additional investment; consider total cost of multi-stage additions vs. installing larger system initially. This customer’s current 2-zone configuration is well-matched to home layout; future zone additions possible if usage patterns change (e.g., basement finish out adding new conditioned space).

Contact Purisync Heating and Air

For zoning retrofits, comfort distribution problems, or HVAC equipment evaluation on slab-on-grade homes, contact our 325 N Kirkwood Road office at (314) 338-5111. Initial consultation includes comfort problem diagnostic, equipment compatibility assessment, ductwork access evaluation, zoning system recommendations matched to specific home layout, and written quote with itemized pricing.

  • Emergency Line (24/7): (314) 338-5111
  • Address: 325 N Kirkwood Rd #245, Kirkwood, MO 63122
  • Email: info@purisyncheatingairconditioning.xyz
  • St. Louis County Mechanical Contractor License: #MC-2014-08439-STL
  • Kirkwood Business Registration: #BL-2014-1187
  • EPA Section 608 Universal: #608U-2014-385721

Contact Us →